Wafer fabrication, EUV lithography, advanced packaging, and testing — under one roof, on one 12-million-square-foot site in West Texas, for the first time at this scale. Everything below is the physical asset every Terafab FX product is ultimately backed by.
Hover or tab through each building below — the whole chip supply chain sits on this one campus, which is the entire point of Terafab.
Four phases from ground-break to full production ramp. Status below reflects where the project actually is today, not a projection.
Grading, piling, and foundation pours across the full 12M sq ft campus footprint.
Completed Q2 2025Structural steel, cleanroom envelope, and the utility backbone (power, gas, ultrapure water) going in now.
In progress — targeting Q1 2027EUV lithography and process tools installed, wired in, and qualified line by line.
Targeting Q4 2027First qualified wafer out, then a staged ramp toward the 250,000 wafers/month target.
Targeting 2028See how the five investment products map to this same construction and revenue timeline.